Howdy, I’m on a Max 20x subscription. Last week: I ran out of fable 5.1 in two days or so, then spent the rest of the week using opus. This week, same model conditions, same workflow, generally reducing my work to make up for the reduced usage (er… the smaller increase promotion or whatever it is), but now I’m running out of all models of usage way before fable 5.1. I don’t run effort any higher than Medium, typically on low with Opus on higher efforts if I’m working in our ERP system. Essentially, I ran a whole week of fable 5.1 low doing business operations, some python build123 solid modeling, and engineering study work that shows 77% all models usage with 47% fable usage for the week. Are you guys seeing this as well? I must not be understanding the ratio of what gets used with fable. The way I read it, it’s impossible to use 100% of your fable-specific usage before you run out of all-models usage. submitted by /u/skunk_of_thunder
Originally posted by u/skunk_of_thunder on r/ClaudeCode
